Engineering

Injection Molding Cycle Time

Estimate total cycle time from part geometry and material thermal properties.

Inputs

Material Selection

Auto-fills thermal diffusivity, melt/mold temperature and heat-deflection temperature.

Part & Machine

Shot weight of the part.

Thickest wall section of the part.

Results

Mold Open/Close Time (T₀)

4.90s

Machine dry-cycle time, scaled by clamping force.

Injection Time (Tᵢ)

0.93s

Fill time, scaled by shot weight.

Holding Time (Tₕ)

3.00s

Pack/hold time, scaled by wall thickness.

Cooling Time (Tᶜ)

6.41s

Heat-diffusion cooling time from material properties.

Total Cycle Time

15.24s

Sum of all four phases.

Material — Reference Values

Materialhdtalphamelt_tempmold_temp
ABS850.0822045
HIPS850.0822045
PS850.0822055
PP850.06523037.5
HDPE500.0922532.5
LDPE500.0922532.5
PMMA900.07522055
POM1150.0622057.5
PA61300.07237.590
PA661500.085282.590
PBT1500.09245100
PET1500.09275100
PC1300.10529085
PC-ABS1100.09525065

About This Calculator

Estimates the injection molding cycle time as the sum of four phases: • Mold open/close time (T₀) — machine dry-cycle, scaled by clamping force. • Injection time (Tᵢ) — fill time, scaled by shot weight. • Holding time (Tₕ) — pack/hold, scaled by wall thickness. • Cooling time (Tᶜ) — heat-diffusion time from the selected material's thermal diffusivity, melt/mold temperature and heat-deflection temperature. These are theoretical values; actual cycle times vary with part geometry, gate design, material grade and machine conditions.